* [commit/www] schedule page update after 7.3.1 release
@ 2011-09-04 19:11 Joel Brobecker
2011-09-04 20:56 ` pfee
0 siblings, 1 reply; 3+ messages in thread
From: Joel Brobecker @ 2011-09-04 19:11 UTC (permalink / raw)
To: gdb-patches
[-- Attachment #1: Type: text/plain, Size: 149 bytes --]
Now that the 7.3.1 release is out, I updated the schedule page.
While working on this, I also fixed a typo that Vladimir reported
on gdb@.
--
Joel
[-- Attachment #2: www-sched.diff --]
[-- Type: text/x-diff, Size: 1691 bytes --]
Index: schedule/index.html
===================================================================
RCS file: /cvs/gdb/htdocs/schedule/index.html,v
retrieving revision 1.49
diff -u -u -p -r1.49 index.html
--- schedule/index.html 26 Jul 2011 18:36:02 -0000 1.49
+++ schedule/index.html 4 Sep 2011 18:59:20 -0000
@@ -59,10 +59,10 @@ Fish]" /></a>
<th>Pre-release:</th><td>July (2011-07-06)</td><td>November (2011-11-23)</td>
</tr>
<tr>
-<th>Release:</th><td>July (2011-07-26)</td><td>March (2011-12-07)</td>
+<th>Release:</th><td>July (2011-07-26)</td><td>December (2011-12-07)</td>
</tr>
<tr>
-<th>reSpin:</th><td>None (as of 2011-07-26)</td><td>[3 months after release]</td>
+<th>reSpin:</th><td>September (2011-09-04)</td><td>[3 months after release]</td>
</tr>
</table>
</center>
@@ -83,6 +83,10 @@ equivalent amount.
<tr> <th>Release</th><th>Estimate</th><th>Schedule</th><th>Actual</th><th>Slip (months)</th><th align=left>Comment</th></tr>
<tr>
+<td>7.3.1</td><td>(none)</td><td>(none)</td><td>2011-09-04</td>
+ <td align=center></td><td align=left>Unplanned minor corrective release
+ decided as soon as we were told that the ISBN and edition number
+ needed to be changed in the GDB User's Guide.</td> </tr>
<td>7.3</td><td>2011-03</td><td>2011-03</td><td>2011-07-26</td>
<td align=center>1</td><td align=left>Regressions due to "dwarf2
physname" took a very long time to fix</td> </tr>
@@ -215,7 +219,7 @@ Floor, Boston, MA 02110-1301 USA.</p>
<p>Verbatim copying and distribution of this entire article is
permitted in any medium, provided this notice is preserved.</p>
-<p>Last modified 2011-07-26.</p>
+<p>Last modified 2011-09-04.</p>
</address>
</body>
^ permalink raw reply [flat|nested] 3+ messages in thread
* Re: [commit/www] schedule page update after 7.3.1 release
2011-09-04 19:11 [commit/www] schedule page update after 7.3.1 release Joel Brobecker
@ 2011-09-04 20:56 ` pfee
2011-09-05 9:19 ` Joel Brobecker
0 siblings, 1 reply; 3+ messages in thread
From: pfee @ 2011-09-04 20:56 UTC (permalink / raw)
To: Joel Brobecker, gdb-patches
> Now that the 7.3.1 release is out, I updated the schedule page.
I see the estimate and schedule for 7.3 were 2011-03 and the actual date was
2011-07-26. I don't understand how that gives a slip of one month. Should it
be a four month slip?
Thanks,
Paul
^ permalink raw reply [flat|nested] 3+ messages in thread
* Re: [commit/www] schedule page update after 7.3.1 release
2011-09-04 20:56 ` pfee
@ 2011-09-05 9:19 ` Joel Brobecker
0 siblings, 0 replies; 3+ messages in thread
From: Joel Brobecker @ 2011-09-05 9:19 UTC (permalink / raw)
To: pfee; +Cc: gdb-patches
[-- Attachment #1: Type: text/plain, Size: 344 bytes --]
> I see the estimate and schedule for 7.3 were 2011-03 and the actual
> date was 2011-07-26. I don't understand how that gives a slip of one
> month. Should it be a four month slip?
Another error (I hate that page - one of these days, I will turn it
into a script and a readable data file). Now fixed. Thanks for letting
me know.
--
Joel
[-- Attachment #2: www-schedule-2.diff --]
[-- Type: text/x-diff, Size: 853 bytes --]
Index: schedule/index.html
===================================================================
RCS file: /cvs/gdb/htdocs/schedule/index.html,v
retrieving revision 1.50
diff -u -u -p -r1.50 index.html
--- schedule/index.html 4 Sep 2011 18:59:45 -0000 1.50
+++ schedule/index.html 4 Sep 2011 20:53:29 -0000
@@ -88,7 +88,7 @@ equivalent amount.
decided as soon as we were told that the ISBN and edition number
needed to be changed in the GDB User's Guide.</td> </tr>
<td>7.3</td><td>2011-03</td><td>2011-03</td><td>2011-07-26</td>
- <td align=center>1</td><td align=left>Regressions due to "dwarf2
+ <td align=center>4</td><td align=left>Regressions due to "dwarf2
physname" took a very long time to fix</td> </tr>
<td>7.2</td><td>2010-08</td><td>2010-07</td><td>2010-09-02</td>
<td align=center>2</td><td align=left>Some blocking problems
^ permalink raw reply [flat|nested] 3+ messages in thread
end of thread, other threads:[~2011-09-04 20:56 UTC | newest]
Thread overview: 3+ messages (download: mbox.gz / follow: Atom feed)
-- links below jump to the message on this page --
2011-09-04 19:11 [commit/www] schedule page update after 7.3.1 release Joel Brobecker
2011-09-04 20:56 ` pfee
2011-09-05 9:19 ` Joel Brobecker
This is a public inbox, see mirroring instructions
for how to clone and mirror all data and code used for this inbox